Lavori Eseguiti
PROJECT | ||||||
Year/s | Project Description | Place | Country | Client | Divison | Category |
2024 | Subcontractor for mechanical fabbrication and erection Compression Gas Station in Malborghetto (UD) | Malborghetto | Italy | Renco / MAN | Plant | GAS |
2024/2025 | Subcontractor for Field Manual welding and Coating of pipe water dn 2500 lengh 5km | Roma | Italy | Acea/Ottavia Trionfale | Trasport | Water Pipeline |
2024/2025 | Mechanical Contractor for interconecting pipeline dn lengh 12km from 8" to 12" diameter | Vado Ligure | Italy | Autorità portuale Genoa | Trasport | Gas-Oil-Water |
2024/2025 | Prefabrication and Erection Modules - Plaquemines 2 LNG | Avenza | Italy | RAM /Baker Hughes | Plant | GAS |
2024 | Mechanical-Contractor TAG Actuators and Valves Replacement CS-G Grafendorf 2024 | Grafendorf | AUSTRIA | TAG | Plant | GAS |
2023/24 | Subcontractor for the mechanical activities of the overhead pipeline external diameter 3048 mm, thick 25,4. | Ginosa | ITALY | FAVER S.p.A. | Transport | Water Pipeline |
2023/24 | Subcontractor for all mechanical activities of around 15 km pipeline construction - Executive project for optimization of water pipe infrastructure for Montedoglio area in Tuscany and Umbria Lot III - DN1000-DN700 and DN500 + plants | Siena | ITALY | KREA COSTRUZIONI S.P.A. | Transport | Water Pipeline |
2023/24 | Subcontractor for all mechanical activities of around 15 km pipeline construction - Executive project for extension of primary influx line for Chiascio river basin Lot II, DN1400-DN800 and DN500 + plants | Spello | ITALY | TECNOSTRADE S.R.L. | Transport | Water Pipeline |
2023/24 | Subcontractor for Field Manual welding, Coating, Concrete coating and floater installation for extension of DN1200 underwater line for Bari Ovest purification plant_ lengh 48km | Bari | ITALY | COBAR-FAVER-SIMEONE | Transport | Variuos |
2023/24 | Fitting out steel pipes and new technologies inside the ships | Monfalcone | ITALY | FINCANTIERI | Transport | Variuos |
2023 | Mechanical-Contractor (SCS/VA) CS Baumgarten 2023 | Baumgarten | AUSTRIA | TAG | Plant | Gas |
2023 | Fitting out steel pipes and new technologies inside the ships | Monfalcone | ITALY | FINCANTIERI | Transport | Various |
2023 |
WORKS RELATING TO CIVIL WORKS, EARTH MOVING, MECHANICAL WORKS, RESTORATIONS,
HYDRAULIC AND VEGETATIONAL ARRANGEMENTS, RELATING TO THE CONSTRUCTION OF THE
INTER-MUNICIPAL PIPELINE FOR THE TRANSPORT OF NATURAL GAS IN THE 3rd TYPE (12 BAR)
2nd section involving the section in the municipality of San Giovanni a Piro (Bosco - Scario
stretch)
|
Salerno | ITALY |
BONATTI - CILENTO RETIGAS
|
Transport | Gas |
2023 | Prefabbrication and erection piping block valve stations Porto Corsini | Ravenna | ITALY | SALP | Transport | Gas |
2022 | ARGE LNG Project Welding Actvities for prefabrication and erection of the Stations | Brunsbuttel | GERMANY | PPS | Plant | Gas |
2022 |
RAG Project- Stringing and manual welding of the main line pipe and manual welding for
prefabrication and erection of the Project LV stations. DN 700
|
Uberackern | AUSTRIA | PPS | Plant | Gas |
2022 | TERRANET Project- Pipeline connection welds DN 500 manual welding | Stuttgart | GERMANY | PPS | Transport | Gas |
2022 | Moravia Capacity Extension DN 1000 Lot I and Lot IIA Welding of Tie-ins DN 1000; Coating of the Tie-in joint; Coating of the Front-line joint | Brno | CZECH REPUBLIC | PPS | Transport | Gas |
2022 | Pipeline Connection DN 250 (10 ") - HPRS 50 decompression plant - DP 24 bar and related works | Sabbioncello/Tresigallo | ITALY | Snam | Transport | Gas |
2021/2022 | Gas Compressor Station - Prefabrication and erection piping, Hydro Testing, painting, coating, insulation works and commissioning | Goleniów | POLAND | Max Streicher | Plant | Gas |
2021/2022 | Prefabrication and Erection Microtunnel and Raiser Boring - Rimini-San Sepolcro- gas pipeline DN 750 (30") - 75 bar - galleria "Monte Botolino" e "Galleria Cava" | Badia Tedalda | ITALY | Salp | Transport | Gas |
2021 | BALTIC PIPE POLAND: Welding of Tie-ins DN 1000/900 | Prusinowo | POLAND | PPS | Transport | Gas |
2021 | Prefabbrication and erection piping block valve stations and pig area for project "Met. Coll. RAVENNA MARE - RAVENNA TERRA 2° TRATTO DN 650 (26"), DP 75 | Ravenna | ITALY | Salp spa | Plant | Gas |
2020 | Cross river - Mechanical works of the pipelines | Vasto | ITALY | ACR Reggiani | Transport | Gas |
2020 | Part of the mechanical works for the station - Expansion of the gas transmission infrastrutture of Bulgartransgaz, pipeline 48" - lot 5 and lot 4 | Veliko | BULGARIA | Bonatti spa | Transport | Gas |
2020 | Execution of the field joints coating and Tie-ins Welding - Expansion of the gas transmission infrastrutture of Bulgartransgaz, pipeline 48" - section A3 | Kardam/Vakovachevets | BULGARIA | Max Streicher Gmbh | Transport | Gas |
2020 | Performance of mechanical works for construction of lie valve stations,pipeline 56" | Plzen | CZECH REPUBLIC | SICIM spa | Transport | Gas |
2019/2020 | Supply manpower for the execution of Tie-ins of the pipeline 40" | Dusseldorf | GERMANY | PPS | Transport | Gas |
2019/2020 | Mechanical works of the ball valve station amd Pig stations ZEELINK Los 4 plus Progect | Dusseldorf | GERMANY | PPS | Transport | Gas |
2018/2019 | Mechanical works of the ball valve station for lots 09-10-11-12 | Dresda | GERMANY | Bonatti spa | Transport | Gas |
2018/2020 | Welding Special Points and Welding Tie-ins 56" Project Eugal Lot 1 and 2 | Anklam | GERMANY | PPS | Transport | Gas |
2017/2018 | ACS02 Metering Station - Piping, equipment, painting, coating and insulation works | Albania | ALBANIA | Renco | Plant | Gas |
2017/2018 | ACS03 Compression Station - Piping, equipment, painting, coating and insulation works | Fier | ALBANIA | Renco | Plant | Gas |
2017 | Works of welding of the pipeline DN 36” for port plant for storage | Trieste | ITALIA | Ecoedilmont | Plant | Gas |
2017 | Costruction bypass pipeline 12" | Monteceneri | SWISS | GeoEdil | Transport | Gas |
2017 | Costruction Pipelines and plant Poggio Renatico-Cremona | Bologna-Reggio Emilia | ITALY | ACR Reggiani | Transport | Gas |
2016/2017 | Costruction Pipelines named "Bretella" - 5 lines: OIL EXPORT LINE (20"); TREATED WATER LINE (8"); POTABLE WATER LINE (6"); LPG LINE (3"); GAS EXPORT LINE (6") - Total length 40 km about | Temparossa (Basilicata) | ITALY | Bonatti spa | Transport | Oil,gas,water |
2016 | Nawara Pipeline - Technical asslstance for start-up induction heating set with coil - Rent induction heating sent | Tunis | TUNISIE | GIE Bouchamaoui Streicher Nawara Pipeline | Transport | Gas |
2015/2016 | Coating Activity Project Arc de Dierrey Lot. 4 DN 1200 (48”) - L= 63 Km | Troyes | FRANCE | Max Streicher Gmbh | Transport | Gas |
2015/2016 | Contract for the procurement of Technical services and related to operating activities mechanical and welding in order to Congo project "Water Treatment Djeno Term" | Djeno | CONGO | Renco SpA | Transport | Gas |
2013/2015 | Realization, maintenance and replacement of gas distribution networks, first intervention included, Lot Nr.2 | Roma | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2013/2015 | Execution of mechanical works (lines extension, maintenance, replacement) on oil fields | BRN Champ | ALGERIE | A.T.I. Stagma / Esigas - Euroservice Impianti srl | Transport | Gas Pipeline |
2013/2015 | Works of extension, strengthening, replacement of networks, building and maintenance of plants of derivation to the users, “integrative” first intervention included. | Faenza | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2013/2014 |
Part of construction work related to the secondary pipeline connection / derivation and new connections to be realized in the construction of the pipeline Zimella - Cervignano DN1400 (56") |
Zimella/Cervignano | ITALY | Max Streicher Gmbh | Transport | Gas Pipeline |
2013/2014 |
Realization of the Methane Pipeline in Bolzano (BZ) (DN 600) |
Bolzano (BZ) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2013/2014 |
Realization of the Methane Pipeline in Bruzzano Zeffirio-Ferruzzano (RC) (DN 400) |
Bruzzano-Ferruzzano (RC) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2013/2014 | Realization, maintenance and replacement of gas distribution networks, first intervention included | Milano | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2013/2013 | Works concerning the realization of the Water Pipeline in Pieve Fosciana (LU) | Pieve Fosciana (LU) | ITALY | Euroservice Impianti srl | Distribution | Water Pipeline |
2013/2013 | Realization of district heating network in Bergamo (BG) | Bergamo | ITALY | Euroservice Impianti srl | Distribution | Heating network |
2013/2014 | Technical advice and assistance on site area: italy-europe and extra-cee country, activities for welding, pe, testing hydraulic, covering joints. | AFRICA - EUROPA- ASIA - AMERICA | AFRICA - EUROPA- ASIA - AMERICA | Euroservice Impianti srl | sevice | GAS |
2012/2014 | Civil work, erection, building and maintenance for methane Pipeline | Verona - Trento | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2012/2014 | Civil work, erection, building and maintenance for methane Pipeline | Pisa - Follonica (GR) | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2012/2013 | Execution of Engineering, Procurement, Construction to connect gas well 51 inside the Sabbioncello Station | Sabbioncello (FE) | ITALY | Euroservice Impianti srl | Plant | Gas Storage |
2012/2012 | Extension Methan Network for the completion of methanization | Pieve Fosciana (LU) | ITALY | Euroservice Impianti srl | Distribution | Extension gas network |
2012/2012 | Execution of weldings and erection of piping DN 700 (28") for Ostia coustline Filling. | Lido di Ostia (RM) | ITALY | Euroservice Impianti srl | service | Sandy material dredged pipeline |
2012/2012 | Execution of welding in ambit of the project "SONATRACH GK3" | ALGERIE | ALGERIE | Euroservice Impianti srl | Transport | Gas Pipeline |
2011/2012 | Execution of weldings for realization of the Methane Pipeline "NEL Pipeline" DN 56" -Lot 6,7 (Germany) | Mecklemburg | GERMANY | Bonatti SpA | Transport | Gas Pipeline |
2011/2012 | Execution of gas pipelines and plants in two municipalities of Calabria. | Sangineto (CS) and Mottafollone (CS) | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2011/2011 | Realization of some changes into the methane pipeline Ravenna-Mestre DN 550 (22”) - P 64 bar | Adria (RO) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2011/2011 | Execution of Connection in Bibbiena and variation in Methane Pipeline Spina di Bibbiena DN 150 (6”) | Bibbiena (AR) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2010/2012 | Works of extension, strengthening, replacement of networks, building and maintenance of plants of derivation to the users, “integrative” first intervention included. | Pordenone | ITALY | Euroservice Impianti srl | Distribution | Extension & Maintenance gas network |
2010/2010 | Supply and installation of 2 new tanks for oily waters inside Settala Storage Station | Settala (MI) | ITALY | Sergen srl / Euroservice Impianti srl | Plant | Gas Storage |
2010/2010 | Part of the mechanical works concerning the realization of the Water Pipeline in Sinni DN 48”, | Sinni (TA) | ITALY | Euroservice Impianti srl | Transport | Water Pipeline |
2010/2011 | Performance of the services and activities 'of electrical protection (cathodic protection) on the construction of the pipeline snam rete gas massafra-biccari lot 1 dn 1200 (48 "), l = 61.5 km and related | Massafra - Biccari | ITALY | Tre Colli spa /Euroservice Impianti srl | Transport | GAS |
2010/2010 |
Completion of share the work of blasting, painting, coating, and control of coatings same; required for the construction of the pipeline: "montalbano elicona - messina - dn 1200 (48"): lot c - traits: to p 0 (start 1 trunk) a v251 2nd body; by p 316 + 15 m 2nd trunk a p 505 (end 3rd trunk) |
Bonatti Spa | ITALY | Bonatti spa | Transport | GAS |
2010/2012 | Met.potenziamento cremona-sergnano dn.48 "custody of all jobs, performance and supplies required for the construction of works of cathodic protection and electricity provide for the construction of the pipeline" strengthening cremona - sergnano dn 1200 (48 ") and works annexed - lot 3 | Sergnano | ITALY | A.T.I. Max Streicher gmbh - Euroservice Systems ltd. | Transport | GAS |
2009/2011 | Execution of mechanical activities for the construction of BERNEAU Gas Station | Berneau | BELGIUM | Renco SpA | Plant | Compression Gas Station |
2009/2011 | Realization of the Methane Pipeline Cremona – Sergnano DN 1200 (48”), P = 75 bar. L = 49,887 km, in Joint Venture with Max Streicher S.p.A. | Cremona - Sergnano (CR) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2009/2011 | Works of extension, strengthening, replacement of networks, building and maintenance of plants of derivation to the users- “integrative” first intervention included. | Barletta - Campobasso | ITALY | Euroservice Impianti srl | Transport | Extension & Maintenance gas network |
2009/2010 |
Part of the mechanical works concerning the realization of the following methane pipelines: Trino – Vercelli DN 350 (14") – 64 bar ; Cortemaggiore – Torino DN 400 (16”) – 60 bar |
Vercelli (VC) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2009/2009 | Execution of part of mechanical works inside STOGIT Station in Ripalta and Sergnano STOGIT Station. | Ripalta (CR) and Sergnano (CR) | ITALY | Euroservice Impianti srl | Plant | Gas Storage |
2009/2009 | Execution of Piping prefabrication and erection for Weelde Natural Gas Compression Station | Weelde | BELGIUM | Renco spa/Euroservice Impianti srl | Plant | Compression Gas Station |
2009/2009 | Part of mechanical works concerning the realization of the Methane Pipeline Larino – Termoli DN 12”. L = about 13,90 km. | Larino (CB) – Termoli (CB) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2009/2009 | Part of mechanical works concerning the realization of the Methane Pipeline “RAG Speicheranbindungsleitung/Puchkirchen-Ha-ag” | Salzburg | AUSTRIA | Euroservice Impianti srl | Transport | Gas Pipeline |
2009/2009 | Putting in safety of the oil pipeline of the wharf of the thermoelectric Station “Ettore Majorana” | Termini Imerese (EN) | ITALY | Euroservice Impianti srl | Plant | Maintenance oil-pipeline |
2008/2009 | Part of civil and mechanical works concerning the realization of the Methane Pipeline Tar-visio – Malborghetto DN 48”, P = 75 bar, L = 19.750 m | Tarvisio (UD) - Malborghetto (UD) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2008/2008 | Part of mechanical works concerning the realization of the Methane Pipeline “SOL PIPELINE DN 36" | Winterdorf | AUSTRIA | Euroservice Impianti srl | Transport | Gas Pipeline |
2008/2008 | Methane Pipeline Donada - Cà Pasqua - Marghera. Realization of variation DN 250 inside Comune di Chioggia (VE). | Chioggia (VE) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2008/2010 |
execution of part of activity 'on the works of surge protection, welding cables pe, painting with epoxy / paint-components bi-metal coatings and above ground, in the replacement of pipeline tarvisio - malborghetto dn 900 (36 ") with dn 1200 (48 "). |
Malborghetto | ITALY | Nacap spa | Transport | GAS |
2007/2008 | Part of the mechanical works concerning the realization of the Methane Pipeline Montalbano Elicona – Messina Plot C – DN 1200 (48”) | Montalbano Elicona (ME) – Messina (ME) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2007/2008 | Execution of Piping prefabrication and erection for Zelzate Natural Gas Compression Station | Zelzate | BELGIUM | Renco spa/Euroservice Impianti srl | Plant | Compression Gas Station |
2007/2008 | Part of the mechanical works concerning the realization of the Methane Pipeline Strengthe-ning Forlì - Faenza DN 400 (16”), P = 75 bar, L = 22.750 m | Forlì (FC) – Faenza (RA) | ITALY | Euroservice Impianti srl | Distribution | Gas Pipeline |
2007/2008 | Part of the mechanical works concerning the realization of the Methane Pipeline Cavarzere - Minerbio DN 36”, P = 75 bar, Lot 2 | Copparo (FE) – Minerbio (BO) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2007/2008 | Part of the mechanical works concerning the realization of the Water Pipeline in Locone DN 1200 and 1600, L = 37,00 km - Italy. | Locone (BAT) | ITALY | Euroservice Impianti srl | Transport | Water Pipeline |
2007/2008 | Part of the mechanical works concerning the realization of the Methane Pipeline Flaibano - Gonars DN 30”, plot 2, km 20,00 | Flaibano(UD) – Gonars (UD) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2007/2007 | Realization of mechanical works concerning the increasing of the storage pressure in Cortemaggiore STOGIT Station | Cortemaggiore (PC) | ITALY | Euroservice Impianti srl | Plant | Storage |
2007/2007 | Part of the mechanical works concerning the realization of a variation in the Methane Pipeline Ravenna – Chieti DN 650 | Senigallia (AN) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2007/2008 | Snam Rete Gas pipeline Carpi - Reggiolo DN 300. Cathodic protection. | Carpi reggiolo | ITALY | Euroservice Impianti srl | Transport | GAS |
2007/2009 | Completion of work of electrical protection active (cathodic protection) on the construction of the pipeline snam rete gas - dn 750 (30 ") |
Mortara - Cosseria Alessandria - Oviglio |
ITALY | Tre Colli S.p.a. | Transport | GAS |
2006/2007 | Construction of the Methane Pipeline Carpi – Reggiolo DN 300 (12”), P = 75 BAR, total length: 11,880 km | Carpi (MO) - Reggiolo (RE) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2006/2006 | Mechanical works concerning the construction of the Methane Pipeline “Alt Adriatic Lng Project DN750 (30”)" | Porto Viro (RO) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2006/2007 |
Cavarzere - Minerbio. Active and passive protection. Subcontracting (Contractor: Bonatti S.p.A.) |
Cavarzere | ITALY | Bonatti spa | Transport | GAS |
2005/2006 | Mechanical works concerning the construction of “Pipelines associated with SGI STAGE 1, SGI STAGE 2 and Korolev of the SGP next generation gathering system (NGGS) | Tengiz | KAZAKHSTAN | Sicim SpA - Euroservice Impianti srl | Plant | Refinery |
2005/2005 | STEAM TRACING works in TOTAL Gonfreville Refinery | Gonfreville | FRANCE | Sim-Euroservice Impianti srl | Plant | Refinery |
2005/2005 | Works for the realization of district heating network in Marmentino V.T. (BS). | Marmentino V.T. (BS) | ITALY | A.C.M.E. Scarl - Euroservice Impianti srl | Distribution | Heating network |
2005/2005 | Methane Pipeline S. Giorgio di Piano – Ferrara DN 250, reconstruction of the methane pipe-line, stretch V. 21 – P. 0; tying commune of S. Pietro in Casale | S. Pietro in Casale (BO) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2005/2005 | Mechanical works for doubling of the Gas Pipeline Arbos-Tivissa (Spain), DN 26”. | Arbos-Tivissa | SPAIN | Euroservice Impianti srl | Transport | Gas Pipeline |
2005/2005 | Mechanical works concerning the realization of the Water Pipeline Monferrato (AL) DN 700 (28”),from Verrua Savoia to Monte Croce | Monferrato (AL) | ITALY | Euroservice Impianti srl | Transport | Water Pipeline |
2005/2006 |
Pipeline DN 10 "+ 3" for a length of 6,000 ml range - Activa and Passive protection. |
Serra di Vito | ITALY | Irem spa | Transport | GAS |
2004/2004 | Mechanical works concerning the Methane Pipeline Campochiaro – Sulmona, 2° lot DN 1200 (48”) | Campochiaro (CB) – Sulmona (AQ) | ITALY | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2004/2004 | Mechanical works for adaptation SNAM Compression Station | Enna | ITALY | Bonatti SpA - Euroservice Impianti srl | Plant | Compression Gas Station |
2004/2004 | Methane Pipeline DN 48” Palmi – Rosarno, Italy. | Palmi (RC) – Rosarno (RC) | ITALY | Sicim SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2003/2004 | Mechanical works for the realization of the Methane Pipeline Snam DN 36” import from Libia, stretch Gela – Enna, Italy. | Gela (CL) – Enna (EN) | ITALY | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2003/2004 | Works of reinstatement of the side involved in the landslide in S.Maria Nuova di Sulzano (BS), related to the Methane Pipeline Polaveno – Darfo Dn 500 – 75 bar | S.Maria Nuova di Sulzano (BS) | ITALY | Euroservice Impianti srl | Transport | Gas Pipeline |
2003/2004 | Mechanical works for the realization of the variations in the Methane pipeline which interferes with the Torino – Milano railway line, Italy. | Crescentino (TO) | ITALY | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2003/2004 | Mechanical works concerning the construction of the Methane pipeline connection EDIPOWER Station | Chivasso (TO) | ITALY | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2003/2003 | Mechanical works concerning the strengthening for Bagnoli (NA) DN 750 (30”), Italy. | Bagnoli (NA) | ITALY | CPL Concordia S.c.a.r.l. - Euroservice Impianti srl | Transport | Gas Pipeline |
2003/2004 | Pipeline Bordon - Flaibano (UD), DN 1200: passive and active protection. | Flaibano(UD) | ITALY | Bonatti spa | Transport | GAS |
2002/2003 | Prefabrication, assembling, erection activities, in Eni-power Station S.p.A., Ravenna (Italy) | Ravenna | ITALY | Comce spa - Euroservice Impianti srl | Plant | Power Station |
2002/2002 | Assistance for the activities of welding, assembling and laying of gas pipelines in several yards, France. | Several places | FRANCE | DLE Snc - Euroservice Impianti srl | Transport | Gas Pipeline |
2002/2002 | Mechanical works concerning the line stations of the Methane Pipeline Trans Austria Gasleitung II LOOP II | Heiligenkreuz, Weitendorf, Wettmannstatten e Holleneg | AUSTRIA | Bonatti SpA - Euroservice Impianti srl | Plant | Gas Station |
2002/2002 | Mechanical works concerning the welding of the joints of the Methane Pipeline Trans Austria Gasleitung II LOOP II DN 40” for a length of 40 Km | AUSTRIA | AUSTRIA | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2002/2002 | Mechanical works for the construction of the Methane Pipeline DN 400 (16”) in Ravenna, Italy | Ravenna | ITALY | CPL Concordia S.c.a.r.l. - Euroservice Impianti srl | Transport | Gas Pipeline |
2002/2002 |
Trans Austria Gas Pipeline Gasleitung, loop2, DN 1000 (40 "), from the station Connecting Heiligenkreuz that of Hollenegg (length 40 Km). Active and passive protection. CLIENT: OMV CONTRACTOR: Bonatti S.p.A. |
Hollenegg | AUSTRIA | Bonatti spa | Transport | GAS |
2001/2002 | Construction of Methane Pipeline DN 250 (10”) in Mortara (PV), Italy | Mortara (PV) | ITALY | CPL Concordia S.c.a.r.l. | Transport | Gas Pipeline |
2001/2001 | Part of mechanical Works for the Methane Pipeline Masera-Gravellona Toce, Italy. | Domodossola (VB) | ITALY | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2001/2001 | Painting of Aircooler Station SNAM in Sergnano, Italy | Sergnano (CR) | ITALY | Nuovo Pignone SpA - Euroservice Impianti srl | Plant | Gas Station |
2001/2001 | Works of assembling on the ground of the pipeline DN 36” for the submarine pipeline Valpocevera (Genova), | Valpocevera (GE) | ITALY | CPL Concordia S.c.a.r.l. - Euroservice Impianti srl | Transport | Gas Pipeline |
2001/2001 | Works of assembling on the ground of the pipeline DN 24” Genova Pegli, Italy. | Genova | ITALY | CPL Concordia S.c.a.r.l. - Euroservice Impianti srl | Transport | Gas Pipeline |
2000/2001 | Mechanical activities for the Methane Pipeline DN 30” for the Station of launching and receipt PIG | Vitinia (RM) | ITALY | CPL Concordia S.c.a.r.l. - Euroservice Impianti srl | Transport | Gas Pipeline |
2000/2001 | Part of Mechanical activities for the Methane Pipeline DN 30" Maenza - Vitinia DN 30”, Italy. | Maenza (LT) - Vitinia (RM) | ITALY | Bonatti SpA - Euroservice Impianti srl | Transport | Gas Pipeline |
2000/2000 | Works in reinforced concrete for the infrastructuration Gas Station in ex area Cogne (AO), Italy. | Cogne (AO) | ITALY | Bonatti SpA - Euroservice Impianti srl | construction | Gas Station |
2000/2000 | Construction of a new methane pipeline 3° type, section cabin S. Pietro in Comacchio – cabin Romea in Porto Garibaldi, Italy | Comacchio (FE) and Porto Garibaldi (RA) | ITALY | CPL Concordia S.c.a.r.l. - Euroservice Impianti srl | Transport | Gas Pipeline |
2000/2001 | Pipeline Maenza - Vitinia (LT), DN 750 (30 "), 84 Km length. Protection active and passive. | Maenza (LT) - Vitinia (RM) | ITALY | Bonatti spa | Transport | Gas |
Perché scegliere ETI S.p.A.
-
Qualità
esperienza ed ottima reputazione
-
Puntualità
rispetto delle tempistiche
-
Sicurezza
attestati e certificati internazionali
-
Leadership
operiamo in Italia e nel Mondo
il tuo partner di fiducia Eurotecnoimpianti S.r.l.
diventa ETI S.p.A.
Forniamo servizi su tutte le principali attività nel settore Oil&Gas. Svolgiamo attività che coinvolgono tutta la catena di trasporto e stoccaggio di idrocarburi, dalla costruzione di impianti e condotte, alla loro manutenzione e riparazione.-
Address
Via Cesare Battisti, 31, 72025 San Donaci (BR)
Via Strada Del Petraro, snc, 73010 Guagnano (LE)
Via Giulio Pastore, 151, 47522 Cesena (FC) -
Contacts
Phone: +39 0547 072547
Fax: +39 0547 072546
Email: info@etispa.com