NAVAL WORKS
PIPING CONSTRUCTION ON CRUISE SHIPS – FINCANTIERI MONFALCONE YARD
Year: 2023 - 2024
Location: Monfalcone- Italy
Role: Mechanical Contractor
Main Contractor: Fincantieri S.p.A.
Client : Fincantieri S.p.A.
Activities Performed by ETI S.p.A.:
The scope of work consisted into management of project materials (pipes), installation on board, preparation for testing, testing and official delivery to the end customer of all the involved piping.
Complete set-up of the section, with the assembly of the pipes related to the area systems referred to in the functional diagrams and related to the set-up sub-networks referred to in the relevant assembly plans on different positions (SR 6000 - 7000 - 3000), arrangement of all the local carpentry works (escape ladders, bases, manholes, lifting eyebolts, iron guides).
Perché scegliere ETI S.p.A.
-
Qualità
esperienza ed ottima reputazione
-
Puntualità
rispetto delle tempistiche
-
Sicurezza
attestati e certificati internazionali
-
Leadership
operiamo in Italia e nel Mondo
il tuo partner di fiducia Eurotecnoimpianti S.r.l.
diventa ETI S.p.A.
Forniamo servizi su tutte le principali attività nel settore Oil&Gas. Svolgiamo attività che coinvolgono tutta la catena di trasporto e stoccaggio di idrocarburi, dalla costruzione di impianti e condotte, alla loro manutenzione e riparazione.-
Address
Via Cesare Battisti, 31, 72025 San Donaci (BR)
Via Strada Del Petraro, snc, 73010 Guagnano (LE)
Via Giulio Pastore, 151, 47522 Cesena (FC) -
Contacts
Phone: +39 0547 072547
Fax: +39 0547 072546
Email: info@etispa.com